Backup Power

Generator Readiness Checklist

Before buying equipment, confirm what the home actually needs powered and whether the panel and site are ready for the generator path.

Turn This Into a Roadmap

Critical Loads

  • Heat or boiler controls
  • Sump pump
  • Refrigerator/freezer
  • Wi-Fi/router and phone charging
  • Medical-device outlet
  • Select lights and security system

Electrical Readiness

  • Panel size is known
  • Circuits are labeled
  • Transfer switch path is understood
  • Old panel or breaker concerns have been reviewed

Site and Family Planning

  • Fuel source has been discussed
  • Generator placement is practical
  • Family knows what will and will not be backed up
  • Startup and service expectations are documented

What to Do Next

A generator readiness assessment turns this checklist into a critical-load plan and E-1 partner review packet.